Aryavart Technologies Development Pvt. Ltd. | MDZTI

RailLogic
Studio

Signalling panel training · 10 cubicles · 1 instructor desk

What this desk trains

  • Six skills, scored from what you doPanel reading, securing the road, authorities and forms, block working, records and registers, train working decisions — scored from panel events, not from a quiz.
  • Order counts as much as actionSequence discipline is measured on its own: the authority issued after the points were clamped, never before.
  • Guided, Corrected, AssessedThe same exercise at three levels of help. The mode is on screen throughout, and the mark records which one earned it.
  • 91 exercises, ~90 fault typesTrack circuit, signal, point, block instrument, interlocking and route, LC gate, communication, train working.
  • The instructor can break the board mid-sessionOne cubicle, a paired station, or the whole room — without pausing the run.
  • Every mark opens its replayNo score on this system that you cannot watch being lost.

Sign on

Take the desk

Cubicle

Select the desk you are sitting at.

No self-registration. Accounts, roles and cubicle assignments are created by the administrator.

Demo accounts